Development

Current projects

Reinforcement of the seabed

Reinforcement of the seabed

We are establishing a new stone bed at one of the port's outer quays to create a stable base for installation ships working with offshore wind turbines.

When ships lower their support legs onto the seabed, the substrate must be able to withstand the heavy load. The stone bed protects the seabed and ensures that we can continue to handle installation ships safely and efficiently in the future.

The project is another step in the effort to future-proof the port's facilities for offshore wind projects in the Baltic Sea.

New promenade between town and harbor

New promenade between town and harbor

We are developing the promenade area at Søndre Bådehavn to create a more inviting connection between the town of Rønne and the harbor.

A central element will be a wavy wooden deck, where Bornholm residents and visitors can stay close to the water and experience the harbor.

The project aims to create better conditions for stays while also ensuring space for the port's daily activities.

The new promenade is expected to be ready in May 2027 in connection with Rønne's 700th anniversary.

New ferry ramps strengthen supply security

New ferry ramps strengthen supply security

We are establishing a new spare ramp at quay 27 and replacing the nearly 50-year-old ferry ramp in ferry berth 3.

The reserve ramp is intended to ensure that freight traffic to and from Bornholm can continue while the existing ramp is replaced. Subsequently, it will become a permanent part of the port's infrastructure.

The project provides greater flexibility in ferry operations and strengthens the port's ability to handle future transport needs. Thus, the investment helps future-proof one of Bornholm's most important connections to the outside world.